Does Your Northern Colorado Home Really Need a 200-Amp Panel Upgrade?

Three Crowns Electric

Maybe, maybe not. The age of your panel and the number of open breaker slots don’t answer the question. A load calculation does: it adds up what your home actually draws plus whatever you plan to add, like an EV charger, heat pump, or hot tub. If the math says your current service can carry it, you don’t need the upgrade. If it can’t, a 200-amp upgrade is the fix, and the quote should cover more than just the box on the wall.

“My electrician says I need 200 amps. Is he upselling me?” We hear some version of that every week, usually from someone in a 1970s ranch in Loveland or Greeley who just bought an EV or got a heat pump quote. It’s a fair question. A 200-amp upgrade is real money, and plenty of quotes get written off a glance at the panel.

How do you know if you need 200 amps?

You measure, then you do the math. Jon Trujillo, our Master Electrician, described the first visit this way on our podcast:

“We do an amperage reading and check out what their home is drawing for power… depending on what they plan on adding, then we’d run a calculation, a load calculation for all their electricity running in the home and give them a sufficient upgrade from there.”

— Jon Trujillo, Master Electrician

A load calculation counts your heating, range, dryer, water heater, air conditioning, and anything new: an EV charger, a heat pump, a hot tub, a shop in the garage. Not everything runs at once, and the calculation accounts for that. If the total fits your existing service, you keep it. If it doesn’t, you upgrade.

Ask for the result in writing. “You’ve got plenty of room” isn’t a load calculation.

What changed in 2026

Colorado moved to the 2026 National Electrical Code on August 1, 2026. Fort Collins, Loveland, Greeley, Windsor, Longmont, and Boulder each run their own permitting, so the edition that applies to your job depends on your address and when the permit was submitted. The building department decides that, not the contractor.

Service upgrades also carry requirements a straight box swap doesn’t, such as an outdoor emergency disconnect for upgraded one- and two-family services. That’s part of why two quotes for “a 200-amp upgrade” can look nothing alike.

The other change is what’s driving the calls. EV chargers and heat pumps are the loads that push older homes past their limit. Utility rebates in Northern Colorado mostly go toward that equipment, not the panel itself, so the panel tends to be the out-of-pocket line on an electrification project.

Mistakes we see before people call us

  • Treating breaker slots as capacity. A full panel might need a subpanel. An undersized service needs an upgrade. Those are different problems with different prices.
  • Upgrading the panel but not the service. A 200-amp panel doesn’t help if the meter base, service conductors, or utility drop are still sized for 100.
  • Comparing quotes by the headline number. One quote covers the interior panel only. Another includes the meter base, grounding, permit, utility coordination, and inspection. Ask what’s in each.
  • Skipping the permit. “It’s like-for-like, no permit needed” is a red flag. A same-size replacement still gets permitted and inspected.
  • Ignoring clearance. The panel needs open working space in front of it, commonly 30 inches wide and 36 inches deep. Shelving or a water heater in the way has to be addressed in the scope.

In Longmont, Longmont Power & Communications runs its own meter pull and re-energization, so ask who schedules that before you pick a date.

Frequently asked questions

Can I add an EV charger without upgrading my panel? Often, yes. If the load calculation shows room on your existing service, a dedicated circuit is all you need. When it’s close, a load-management device can be an option, depending on the equipment and your inspector.

My panel is full. Do I need a subpanel or a new main panel? It depends on whether you’re out of slots or out of capacity. A subpanel solves the first. Only a service upgrade solves the second. The load calculation tells you which one you have.

How long will the power be off? For a typical panel swap, the outage is part of one work day. The utility has to disconnect and reconnect service, so your electrician should give you the outage window in writing before work starts.

What we do about it

Every panel job at Three Crowns Electric starts with an amperage reading and a load calculation, and we’ll tell you when you don’t need the upgrade. If you do, you get the full scope and price on paper before we start. Salaried technicians, a 2-year warranty, and 5.0 on Google. See our electrical panel services or call (970) 460-0014.